Calculator hub / Module 05
Calculator 05
Mining Site Total Cost of Ownership
Over a 20-year horizon, how does an independently benchmarked remote-mine diesel power cost compare with the Unity Battery cost figures Deployable Energy has stated?
Annual energy served
—
—
Diesel case — cost over the horizon
—
—
Unity Battery case — cost over the horizon company-stated, unverified
—
—
Units required
—
—
Unity Battery capital outlay company-stated
—
—
Difference over the horizon
—
—
Indicative crossover point
—
—
Cumulative cost over the horizon
Excluded from both sides
- Decommissioning, spent-fuel management, long-term waste liabilities and site remediation.
- Licensing, regulatory approval, environmental assessment and community consultation costs — which in Australia currently have no lawful pathway at all for a civilian reactor.
- Insurance, third-party liability cover and nuclear-specific security requirements.
- Grid connection, distribution within the site, and balance-of-plant civil works.
- Refuelling or core-replacement events, and any mid-life capital refit on either side.
- Carbon costs, carbon value, taxes, duties, financing costs and inflation.
- Diesel capital replacement cycles beyond the entered cost basis, and diesel price volatility over a 20-year horizon.
- Redundancy provisioning: unit counts are calculated on load alone, with no N+1 allowance applied on either side.
Because material cost categories are excluded from both sides, this module is an orientation tool for framing a question, not a total cost of ownership study, a feasibility assessment, or a basis for any decision.
Method
The formulas, in full
Diesel side, default basis. A$240–450/MWh, the independent remote-mine diesel electricity benchmark (ECD Online citing AECOM analysis). This is the default because it is the most defensible published Australian figure available.
Project-derived sensitivity. A$800–1,110/MWh comes from project research and is materially higher than published Australian benchmarks. It is available only as an explicitly labelled opt-in sensitivity and is never the default. Selecting it does not make it a validated figure.
Unity Battery side. US$10 million per 1 MWe unit capital and US$350,000 per unit per year operating cost are Deployable Energy planning figures. They are company-stated and unverified. No independent engineering, cost or schedule review has been completed, and there is no operating unit anywhere from which to derive actual costs.
The crossover point is arithmetic on the entered assumptions. It is not a payback period, not a return, and not a projection.
Provenance
Constants and sources
General information only
This calculator provides general, illustrative information only about hypothetical energy-generation scenarios. It does not take into account your personal circumstances, objectives or financial situation, and does not constitute financial product advice, an offer of securities, or a recommendation to invest in Deployable Energy Fund Limited, Deployable Energy Limited, or any other entity. Figures are drawn from third-party Australian government, regulator and industry sources (cited on this page) and, where expressly badged, from Deployable Energy’s own unverified planning assumptions. They are provided for general educational and illustrative purposes only. The Unity Battery microreactor has not yet been deployed commercially, and civilian nuclear power generation is not currently permitted in Australia under the EPBC Act and the ARPANS Act (and, in several states, additional state legislation). Nothing on this page should be relied upon as a representation that deployment in Australia is imminent or currently lawful.