What does it cost to run poles and wires out to a remote site — and what capital would a site not spend if it did not have to?

Site assumptions

50km

Typical remote community and mine range: 20–300 km.

Voltage class

The published A$4.6–13.1M/km band covers new transmission-class connections as a single range. Selecting a voltage class moves the displayed window within that one range — it is an interface convenience, not a separately sourced per-voltage-class figure.

Position within the band

Terrain, easement difficulty, river and road crossings, and labour access all move a real route within the band. The headline output is always reported as a range.

1,000kWe

Demand does not change the per-kilometre capital estimate. It is used only to state how many 1 MWe units a site of this size would nominally require, before any redundancy allowance.

Left blank by default. Network charges are site and jurisdiction specific and are not defaulted anywhere in this suite. Supply a figure from your own tariff schedule to see an annual charge line.

Illustrative avoided grid-extension capital cost

—

—

Applied unit cost window

—

—

Nominal 1 MWe units for the entered demand

—

Before redundancy. A real deployment would size for N+1 or better; this calculator flags that rather than assuming it.

Optional annual network charge

Not supplied

Shown only when you enter a tariff from your own schedule.

Forward-looking illustration These outputs are forward-looking statements: scenario estimates built from the assumptions you have entered and the constants listed below. They are based on assumptions that may not prove correct and involve known and unknown risks and uncertainties. Actual results would differ materially. No representation or warranty is given as to the achievement of any figure shown. Outputs describe avoided cost, emissions or noise at a hypothetical operating site — they are not returns, yields, distributions or any measure of investment performance. Civilian nuclear power is not currently lawful in Australia, so this scenario could not be built today.

Capital cost only — what is excluded

  • This figure is capital cost only. It excludes ongoing network losses, line maintenance and vegetation management, and easement, land access and native title costs — each of which needs site-specific quotes and legal work.
  • It excludes any cost on the microreactor side, and excludes the cost of the generation a network extension would have delivered.
  • It does not account for a network business’s own connection policy, contribution arrangements, or whether an extension would be approved at all.
  • The band is presented as a range because the underlying source is a range. No single point estimate is offered, and false precision is deliberately avoided.
  • Nothing here implies a network extension is uneconomic or unavailable in general. Uranium endowment, AUKUS and manufacturing statistics are not evidence about network cost and are not used in this module.

Open data gap

The A$4.6–13.1M/km band is project-derived, sourced to an internal Deployable Energy cost report and used across the project’s addressable-market work. It has not been reconciled against a public per-kilometre benchmark.

The independent cross-check is the AEMO Transmission Cost Database, which publishes cost benchmarking by line type and voltage class. Pulling AEMO line-item figures and reconciling them with this band is a launch gate for this module. Until that is done, treat the output as an order-of-magnitude illustration.

Method

The formulas, in full

Avoided capex (low) = Distance (km) × UnitCostLow (A$M/km) Avoided capex (high) = Distance (km) × UnitCostHigh (A$M/km) Optional, only if a tariff is supplied: Annual network charge = Site demand (kW) × Tariff (A$/kW/yr) Nominal units = ceil(Site demand (kW) ÷ 1,000 kWe)

The unit-cost window is taken from the single published band of A$4.6–13.1M/km. The voltage-class control positions the window in the lower or upper half of that band, and the low/mid/high control narrows it. Both controls are presentation devices for navigating one range. Neither introduces a new sourced number, and the widest possible output remains bounded by the published band.

Distance is a straight-line input. Real route length exceeds straight-line distance, often substantially, so a real project’s route kilometres should be entered rather than map distance.

Provenance

Constants and sources

General information only

This calculator provides general, illustrative information only about hypothetical energy-generation scenarios. It does not take into account your personal circumstances, objectives or financial situation, and does not constitute financial product advice, an offer of securities, or a recommendation to invest in Deployable Energy Fund Limited, Deployable Energy Limited, or any other entity. Figures are drawn from third-party Australian government, regulator and industry sources (cited on this page) and, where expressly badged, from Deployable Energy’s own unverified planning assumptions. They are provided for general educational and illustrative purposes only. The Unity Battery microreactor has not yet been deployed commercially, and civilian nuclear power generation is not currently permitted in Australia under the EPBC Act and the ARPANS Act (and, in several states, additional state legislation). Nothing on this page should be relied upon as a representation that deployment in Australia is imminent or currently lawful.