Why is DEFL seeking to invest in Deployable Energy in the United States? The attraction is a combination of technology and business design: compact nuclear energy, manufactured as a repeatable product, delivered where customers need it, and supported through a long-term service relationship.
What Unity is (0:20)
Despite its name, Unity is a nuclear microreactor, not a battery that stores electricity. Deployable Energy in the United States is developing a modular design targeting about 1 megawatt of electrical output per unit.
Factory manufacture (0:37)
First, factory manufacture. Unity is designed around standard modules, familiar nuclear-grade materials and established manufacturing processes. Repeating the same design can improve quality, simplify procurement and reduce costs as production grows. The core and shielding travel in a standard twenty-foot container, with separate power-conversion equipment. The idea is to install a manufactured system, rather than build a conventional large nuclear plant from the ground up.
Established fuel (1:12)
Second, established fuel. Unity uses uranium dioxide enriched to four point nine five per cent. This connects it to the existing commercial fuel industry, rather than making it dependent on higher-enrichment fuel or a new specialised manufacturing process. The aim is lower cost and simpler supply. The innovation is a compact reactor built around a familiar, widely used fuel.
Managed fuel replacement (1:40)
Third, managed fuel replacement. The planned service model puts fuel supply and replacement with Deployable Energy, on an approximately five-year cycle. A replacement unit arrives and the used unit returns to a central facility. This is intended to avoid on-site refuelling and separate stores of fresh or spent fuel at the customer's premises. The commercial plan includes centralised refuelling and recycling, with the detailed recycling arrangements still to be confirmed.
Safety by design (2:14)
Fourth, safety by design. Unity gives water and helium different jobs. Water slows neutrons to sustain the reaction, while helium carries heat away. Helium is inert: it does not burn or chemically generate hydrogen. This is a specific advantage of the coolant, alongside the design's inherent safety features and engineered barriers. The objective is protection built into the system, rather than relying only on operator action.
On-site power (2:48)
Fifth, on-site power. Unity is designed for remote and behind-the-meter operation, including sites without a national-grid connection. A customer could generate electricity beside its own operations, avoiding a new long-distance transmission connection. Local switchboards, cables, controls and supporting equipment still connect the plant to the customer. Several modules could work together to match the site's demand.
Electricity and useful heat (3:18)
Sixth, electricity, heating and cooling. A reactor produces heat first. Unity's design targets about one megawatt of electricity, with around one and a half megawatts of recoverable heat for useful work. That heat could provide hot water or steam for washing, drying and industrial processes. A heat exchanger transfers energy between separate circuits, without mixing the reactor's fluid with the customer's water.
Heat-driven cooling (3:45)
Heat can also make cold. An absorption chiller uses heat to drive refrigeration and produce chilled water for data centres, cold stores and air conditioning. Think of a gas-powered caravan fridge, at industrial scale. The chiller and pipework are additional equipment matched to the site. Electricity, useful heat and cooling together are called tri-generation: more useful work from the same fuel.
Potential Australian applications (4:11)
These capabilities connect directly with familiar Australian energy needs.
Remote mines (4:17)
If the technology and legal pathway were established, a remote mine could compare modular generation with its existing energy arrangements.
Outback communities (4:29)
An outback community could assess power for essential services with community priorities at the centre.
Data centres (4:37)
A data centre could examine firm generation alongside its backup and cooling systems.
Defence facilities (4:44)
A defence facility could consider resilience and security.
Recovery and logistics hubs (4:49)
A recovery or logistics hub could assess a pre-planned, licensed installation.
Zero-power criticality (4:56)
On 30 June, 2026, Unity achieved a zero-power criticality demonstration at Idaho National Laboratory.
The next development stage (5:05)
The next stage is integrated power generation. A full-power demonstration at Idaho National Laboratory is planned for twenty twenty-seven. In October twenty twenty-six, Deployable Energy announced Sargent and Lundy's appointment for engineering and licensing support, advancing preparations for a construction permit application.
The commercial rationale (5:32)
For DEFL, the opportunity is the combination: repeatable equipment sales, long-term fuel and operating services, and customers who need more than electricity alone. The proposed investment is exposure to the company developing this platform for international markets. Future Australian applications could expand that opportunity, but the investment case does not depend on Australia first changing its nuclear policy.
DEFL and the SAFE (6:06)
Eligible investors would acquire shares in DEFL. DEFL would purchase the SAFE agreement rather than acquire DE USA shares at that point.
Read the IM (6:18)
For the full investment structure, terms and risks, read the current Information Memorandum and the supporting material on the DEFL website.
Source notes for the briefing
Design and development evidence:
DE technology overview;
DE presentation to the NRC, 14 September 2026;
NRC project record;
DOE criticality experiment scope.
Heating and cooling:
DOE absorption-chiller fact sheet.
Read the Commercial Briefing and heating-and-cooling explainer
with the current IM.
Progress:
DE DOME announcement, 7 October 2026;
DE engineering and licensing announcement, 14 October 2026.
See the dated development record.
Australian illustrations are potential uses, not announced sites.
See the legal and project pathway above. DEFL’s proposed investment is
in the US developer through a SAFE; the IM governs the investment structure and risks.
Closing notices: on screen only
The following closing slide is not narrated. It remains visible
for 10 seconds; pause the recording or read the text here at your own pace.
Wholesale clients only under section 761G of the Corporations Act 2001 (Cth).
General information only; it does not take account of your objectives, financial situation
or needs. Not personal financial advice, an offer or a recommendation to invest.
Read the current IM and obtain independent professional advice.
Illustrative settings are not operating Unity installations or announced Australian
projects. Design targets, future uses and outcomes are uncertain and subject to testing,
approvals and legal requirements. Actual results may differ materially. No outcome is assured.
This is not a Chapter 6D disclosure document or a Part 7.9 PDS. Any offer would be made
only to wholesale clients under applicable exemptions and definitive transaction documents.
Deployable Energy Fund Limited: ACN 701 609 387. Financial services are provided by
Deployable Energy Funds Management Pty Ltd (ACN 701 592 350 | ABN 38 701 592 350),
a Corporate Authorised Representative (CAR No. 1322961) of Deployable Energy AFSL Pty Ltd
(ACN 122 284 888), AFSL No. 478547.